Power Industry
Problem:
A cogeneration facility in North Carolina required maximum reclaim and equipment reliability in the reclamation of coal for boilers.
The Carman Solution:
Carman recommended two Drawdown Hoppers located on each side of two stacking tubes. Field tests conducted by the customer report the reclaim achieved is nearly identical to that predicted.